Intelligent water supply system
●Closed cooling tower+ tertiary water treatment ensures clean water quality and non-scale formation of mold flowing channel
●Encircling waterway, inflow+ backwater=the same length of each set of pipeline. Balance of each set for the entire factory of the inflow pressure, the backwater no pump siphon pressure 0.0KG, flow design 3m/s
●Difference of height, factory closed waterway, gravity flow (level by level amplification of backwater pipeline with good siphon effect)
●1 pump products the effect of 2 pumps, and energy consumption that of 0.5 pump,
●standardization of product process, stability of quality, rapidity of products
●The compressed air from water inlet to die and then out from return pipe, thus clearing the water in the die
●Real-time monitor the water flow change of the runner hole and the anti-blocking runner alert system, connect to computer and mobile terminal by MES big data
●Energy saving start and stop for small jack-head pump and cooling tower (not start in three quarters), starting temperature can be adjusted, about 50%~70% of energy consumption can be saved in one year
●Humanized design interface, simple and easy to operate; pressure can be freely set and automatically adjusted according to the required power; water pump automatic switch and sending out alarm for system failure, no loss will be caused by stopping production
●Encircling waterway, inflow+ backwater=the same length of each set of pipeline. Balance of each set for the entire factory of the inflow pressure, the backwater no pump siphon pressure 0.0KG, flow design 3m/s
●Difference of height, factory closed waterway, gravity flow (level by level amplification of backwater pipeline with good siphon effect)
●1 pump products the effect of 2 pumps, and energy consumption that of 0.5 pump,
●standardization of product process, stability of quality, rapidity of products
●The compressed air from water inlet to die and then out from return pipe, thus clearing the water in the die
●Real-time monitor the water flow change of the runner hole and the anti-blocking runner alert system, connect to computer and mobile terminal by MES big data
●Energy saving start and stop for small jack-head pump and cooling tower (not start in three quarters), starting temperature can be adjusted, about 50%~70% of energy consumption can be saved in one year
●Humanized design interface, simple and easy to operate; pressure can be freely set and automatically adjusted according to the required power; water pump automatic switch and sending out alarm for system failure, no loss will be caused by stopping production